Sunday, March 8, 2015

Tiedown bracket drilling

Temps shot above freezing so I tackled the tie-down brackets. First I measured, marked & drilled the brackets.
  Next I taped the spacers to the spars,
 Clamped the bracket with bolt alignment hole drilled to the spar,
And drilled the bolt holes through.
 And right side.
I deburred the holes and started drilling the platenut holes but had to break for dinner. Hopefully with the time change and warmer weather I'll be able to keep after it.
 
Wings: 2.5 hrs

No comments:

Post a Comment